Final Walkthrough in Timberwood Park New Builds

by Tara Medina

The surrounding landscape in Timberwood Park, TX — Final Walkthrough in Timberwood Park
 
By Tara Medina · Nov 27, 2026
 

Decide before you sign who will track the homesite details, selection deadlines, inspection access, and punch list, and get each one in writing. Then use the final walkthrough to verify the finished home against your contract and selections, not to discover problems for the first time.

What should you watch from lot selection to the final walkthrough in Timberwood Park?

Watch five things: the specific homesite, the contract and its exhibits, your selection deadlines, inspection timing, and the written punch list. The final walkthrough in Timberwood Park is the last checkpoint, and it only works if the earlier decisions were documented. I treat a new build as a sequence of decision points, not a single promised completion date.

Key Takeaways

  • Texas uses separate TREC contract forms for incomplete and completed new-home construction, so the form must match the home's status when you contract.
  • You should review the specific homesite, not just the subdivision, for slope, drainage, easements, access, utility locations, and any lot premium before you commit.
  • The TREC new-home form lets you bring inspectors of your choosing, but the contract and the builder's site-safety rules control how and when visits happen.
  • Verbal promises about upgrades, fencing, landscaping, or completion timing only count once they are in signed contract documents or addenda.
  • The final walkthrough verifies the finished home against your contract and selections, and it does not replace an independent inspection.

What should you check before choosing a lot in Timberwood Park?

Check the homesite itself, not the subdivision or the model home. Two lots in the same Timberwood Park section can differ in slope, drainage, privacy, and what is allowed to be built next to them.

What belongs in your lot review file?

Before you sign anything, I want these documented for the exact homesite:

  • Slope and drainage patterns, including any retaining-wall requirements
  • Easements and utility locations, which affect where you can place a pool, fence, or addition later
  • Access and orientation, including how the driveway and sun exposure work on that lot
  • Privacy and adjacent future development, since an empty lot next door will not stay empty
  • Any lot premium and exactly what it covers

Confirm these through the builder's site plan, the plat or recorded documents, the community restrictions, and written builder disclosures. A model-home visit tells you about finishes, not about your lot.

Is the lot inside San Antonio city limits?

Confirm the exact jurisdiction before you rely on any permitting, utility, roadway, or tax information. A Timberwood Park mailing address does not by itself tell you whether a particular homesite sits inside San Antonio city limits. That is a quick question to settle early and an expensive one to guess at.

Who protects your interests while the builder builds?

The builder's representative manages construction and sells homes. You need someone whose only job is your side of the deal, from lot selection through the final walkthrough. That is how I work with my new-construction buyers. If you are using VA financing, my post on VA loans for new construction in Timberwood Park covers how that fits into the build.

Review the buyer-representation agreement before you rely on anyone. TREC states that it must be in writing and signed by the buyer to be binding, so read the services, the term, and the compensation provisions. Broker fees are fully negotiable and not set by law, and any buyer-agent compensation is a separate, negotiable item.

What should the contract and construction schedule lock in?

The contract should lock in your selections process, your deadlines, and the consequences of delay, all in writing. A promised move-in month is not a contract term.

Which contract form applies to your build?

For a home that is not yet finished, TREC's rules point to the New Home Contract (Incomplete Construction). A finished home uses the completed-construction version. TREC says its promulgated forms are intended primarily for license holders trained in their use, which is one more reason to have a professional read the exhibits with you.

How do selections affect your timeline?

The incomplete-construction form says that, where the construction documents allow selections, your selections must conform to the builder's normal standards and must not, in the builder's judgment, adversely affect marketability. So before you pick finishes, get these in writing:

  • Selection deadlines and the consequences of missing them
  • Pricing and allowance rules
  • The change-order procedure
  • Any promises about upgrades, views, fencing, landscaping, or appliances, converted into signed addenda

What milestones should you track?

Exact schedules depend on the builder and the lot. This is the tracking file I build for a buyer, as a planning tool and not a legal requirement:

Stage What to confirm Where it should live
Lot selection and contract Homesite details, lot premium, exhibits, financing and earnest-money deadlines Contract, site plan, plat
Design selections Deadlines, allowances, change-order rules Selection sheets, addenda
Permitting and slab Jurisdiction, approvals, foundation progress Builder updates
Framing and rough-ins Mechanical, electrical, and plumbing work before walls close Independent inspection report
Insulation, drywall, trim Cabinets, trim, exterior progress Photos, builder updates
Substantial completion Finished home against plans and upgrade sheet Independent inspection report
Punch list and final walkthrough Open items, responsible parties, target dates Written punch list
Closing and warranty Title-company coordination, post-closing warranty requests Chicago Title, warranty paperwork

What if the home isn't finished on the scheduled date?

Read the completion-date and delay provisions in your executed contract before you sign, not after a date slips. If you have a PCS report date or a lease ending, tell me early so we can weigh those terms against it. My post on building a new home near Randolph AFB step by step walks through the same timing pressures.

When should you schedule inspections during a Timberwood Park build?

A common planning approach is to inspect after major framing and rough-ins, again around completion, and then verify at the walkthrough. That is a plan, not a statutory requirement, and your contract controls what is actually allowed.

Can you bring your own inspector?

Yes, under the TREC new-home form. It provides that the seller must permit the buyer and the buyer's agents reasonable access, and that the buyer may have the property inspected by inspectors the buyer selects who are licensed by TREC or otherwise permitted by law. Builders still set site-safety rules, so ask in writing which stages allow independent inspections and how much notice they need.

What should you expect from the report?

TREC rules require a regulated inspector to prepare a written report for each inspection, identifying observed deficiencies. Send that report to the builder in writing and keep your own copy with the photos.

TREC's consumer FAQ notes that a buyer may use an option period to inspect the property and negotiate an amendment for necessary repairs. Whether you have one, and for how long, depends on your executed contract.

The form also requires the seller to turn existing utilities on at the seller's expense and keep them on while the contract is in effect. That matters when your inspector needs to test systems before closing.

What should you do at the final walkthrough in Timberwood Park?

Use the final walkthrough in Timberwood Park to verify the finished home against your contract, plans, selections, upgrade sheet, and written change orders. It is a verification step. TREC's inspection rules separately recognize that a written inspection report is not a substitute for an inspection by an inspector of the buyer's choice, and the reverse is true too.

What do I check during the walkthrough?

  • Compare every selection and upgrade to your signed paperwork
  • Test accessible systems, doors, windows, appliances, and fixtures
  • Inspect finishes for damage, gaps, and uneven work
  • Photograph anything incomplete or damaged
  • Get a written punch list with the responsible party and a target date for each item

Do not let verbal assurances stand in for that list. If something is not on paper, it is hard to hold anyone to it after closing.

How does the walkthrough connect to closing?

Once the punch list is documented and your timeline works, closing runs through the title company, Chicago Title in this case. Your own transaction costs are specific to your contract and loan, so I run those with you individually. A process overview like how to buy a new construction home helps, but your contract is what controls.

FAQ

What should I check before choosing a new-construction lot in Timberwood Park?

Check the specific homesite for slope, drainage, easements, retaining-wall requirements, access, utility locations, orientation, privacy, adjacent future development, and any lot premium. Confirm each through the site plan, recorded documents, community restrictions, and written builder disclosures.

Can I have my own inspector look at a new home before closing?

Yes, the TREC new-home form provides that the buyer may have the property inspected by inspectors the buyer selects who are licensed by TREC or otherwise permitted by law. Builder site-safety rules and notice requirements still apply, so confirm them in writing.

When should I schedule inspections during a build?

A common planning approach is after major framing and rough-ins, again near completion, and then at the final walkthrough. This is a planning approach and not a legal requirement, and your contract and the builder's access rules decide what is possible.

What happens if the home is not finished by the scheduled closing date?

It depends on the completion and delay terms in your executed contract. That is why I review those provisions with you before signing, especially if you are working around a PCS report date or a lease ending.

Can my buyer's agent attend builder meetings and inspections?

Generally yes, and the TREC form provides for reasonable access for the buyer and the buyer's agents. Confirm the builder's own rules, and make sure your written representation agreement spells out which meetings and visits your agent will handle.

Where does this leave you?

A smooth final walkthrough comes from decisions made months earlier: the lot, the contract exhibits, the selection deadlines, and the inspection plan. If you are considering a build in Timberwood Park, I'll review the homesite and contract with you and keep the milestones in front of you while the builder builds. Schedule a consultation with me before you sign.

About Tara Medina

Tara Medina is a San Antonio REALTOR® and leader of the Medina Realty Group who specializes in VA loans, new construction, and helping service members PCS to San Antonio. A 25-year Navy spouse, she has helped 100+ clients and ranks among the Top 1.5% of agents nationwide per RealTrends. She is a Top 1% Elite agent at Real Broker and has earned over 100 5-star reviews on Google.

Real Broker, LLC · 210-942-9323

Equal Housing Opportunity. Real estate brokerage is regulated by the Texas Real Estate Commission. This article is general information, not legal, tax, or financial advice; confirm your own numbers and terms with your title company, tax advisor, or lender.

GET MORE INFORMATION

Tara Medina
Tara Medina

Agent License ID: 758667

+1(210) 942-9323 | tara@taramedina.com

Name
Phone*
Message